patch https://{host}/platform/bulkgeohaz/v1/jobs/
Updates the specified bulk geocode job.
This operation may be used to udpate the priority
or status
of a bulk geohazard job.
The priority of the job factors into the scheduling of that job for processing. Jobs with a lower priority (e.g. Low
) are generally run later than jobs with a higher priority (e.g. High
). By default, every job is given a Medium
priority. Principals assigned to a group with the Portfolio Manager or Cat Modeler role can change the status of jobs.
A bulk geohz job can be canceled if it has a QUEUED
status. A canceled job does not count against the tenant’s resource quota.
Entitlements
RI-RISKMODLER
BULK_GEOHAZ, geocode, priority, status